UNIVERSITÉ DE
MONTRÉAL'S MIL CAMPUS
Université de Montréal’s teaching and research activities were expanded to a new site (MIL campus) located in the Outremont borough which is close to its main campus.
The initial development phase of this new site involved decontaminating and urbanizing the site which had been used as a railway yard for close to a century. The next phase involved building the Science Complex, a new pavilion with two wings that house four of UdeM’s Faculty of Arts and Sciences departments (chemistry, physics, geography and biology).
Phase 2 involved expanding the Science Complex which required the addition of two new wings to the east and to the west of phase 1 and the addition of a new installation, Institut Courtois, a basic research institute made possible by a historic philanthropic donation from the Fondation J. Courtois.
CLIENT
Location
Timeline
2021 to 2028 (phase 2)
Surface area
31,000 sq. m. (phase 2)

PRIMARY CHALLENGES
- Fixed implementation schedule based on the academic calendar.
- Changes to the project scope following its launch required design adjustments with minimal impact on the timeline.
- Sensitive scientific equipment and specialized laboratories called for precise coordination of consultants, professionals and suppliers.
DECASULT’S CONTRIBUTION
COMPREHENSIVE PROJECT MANAGEMENT AND DELIVERY
Strategic advice
- Delivery method selection
- Project subject to the major projects directive
Support with a focus on collaboration
- Coordination of the integrated design process (IDP)
Budget estimate and management
- Construction costs estimate
- Project budget preparation
- Financial cost consultation
- Cost control and tracking
Dispute prevention and resolution
- Contract management
- Defect and/or claim management
- Construction site registrar
Performance analysis and optimization
- Value analysis
- Risk and opportunity management
- Project commissioning management
- Documentation management
- Reporting